Form Placement

The form support brackets are attached to the anchors installed in the concrete near the top of the previous lift. With the outside forms rolled back, installation of rebar, embedments, and box-outs can proceed. Once completed, the outside forms are rolled into position, and the taper ties are installed ready for the next pour. The hydraulic ram usually remains extended and attached to the second lift below during the casting of concrete.