Productivity

The jump form system is a very productive one that allows contrac­tors to complete a floor cycle every 2 to 4 days, depending on the size of the floor and the height of the wall. Also, because jump forms are braced from the outside, no or minimum inside bracing is needed, thus eliminating interference with interior shoring.