Resetting

After the crane is released, wind anchors are attached at either the tie location or the jump shoe inserts, and the gang is cleaned and oiled in preparation for the next pour. The form panel is then moved forward until it comes in contact with the top of the previ­ous pour. The gang is plumbed using the wall brace, another gang is positioned on the opposite side of the wall, and ties are installed (Figure 6.12).

Подпись:It should be noted that there are two different scenarios for forming and pouring concrete walls. First, the slab pour immedi­ately follows each wall, and thereby provides the means of support for the gang on the left side as indicated. Second, there is no floor available to support the formwork, or the walls and columns pro­ceed ahead of the floor. In this case, two sets can be used that jump past each other in an alternate fashion.

Leave a reply

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>