Change in the Design

It may arise that an owner’s requirements have changed since the contract was signed. The project manager registers such changes by filing Form (7a). Then all the departments are informed about the change(s) required.

Engineering dept.: Date:

Doc. No.:

4a

Engineering Company

Client:

Phone:

Fax:

Email:

Project: Project No.: Project Mgr.: Date:

Design input:

Option

Define requirement

Work description

ACI, BS, EC

Specifications

Final, preliminary

Structural analysis

Feed, detail

Design

No, summary, detail

Calculation sheet

Steel, concrete, prestress concrete, others

Type of structure

Sketches, construction drawings, as built

Drawings

AO, A1, A4

Drawing size

Start date:

Finish Date::

Name:

Date:

Signature:

Engineering dept.: Date:

Doc. No.:

5a

Engineering Company

Client:

Phone:

Fax:

Email:

Project: Project No.: Project Mgr.: Date:

Review design and approval

Date of revision 1:

Notes:

Date notes completion:

Date of revision 2:

Notes:

Date notes completion:

Date of final approval

Remarks:

Name:

Date:

Signature:

Engineering dept.: Date:

Doc. No.:

6a

Engineering Company

Client:

Phone:

Fax:

Email:

Project: Project No.: Project Mgr.: Date:

Review design document

Item

Wrong

Right

Modifications

Technical data

Dimensions

General layout

Error in Writing

Other

Name:

Date:

Signature:

Engineering dept.: Date:

Doc. No.:

7a

Engineering Company

Client:

Phone:

Fax:

Email:

Project: Project No.: Project Mgr.: Date:

Register project document

Export

Import

Register

Doc.

Date

Review

No.

Form

Doc.

No.

Date

Review

No.

Form

Doc.

No.

Name:

Date:

Signature: