Top-Down Estimates

Top-down estimates are used to estimate costs early in the proj­ect, when detailed information about the project is very limited. The term "top-down" indicates that the estimate is made actually at the topmost level of the project, yielding a single overall "ball park" figure. This type of estimate requires little effort and time to produce. However, its accuracy is not as high as it might be with a more detailed effort.