(1) Unwatering Phase I excavation.
(a) No measurement will be made for unwatering Phase I excavation.
(b) Payment for unwatering Phase I excavation will be made at the lump sum price and shall constitute full compensation for furnishing all plant, labor, materials, and equipment necessary to unwater Phase I excavation.
(2) Surface water control and sump pumping.
(a) No measurement will be made for surface water control and sump pumping.
(b) Payment for surface water control and sump pumping will be made at the lump sum price and shall constitute full compensation for furnishing all plant, labor, materials, and equipment for surface water control and sump pumping, irregardless of the source of water.
(3) Deep dewatering wells.
(a) Dewatering wells will be measured for payment on the basis of each well successfully completed and accepted by the Government.
(b) Payment at the contract unit price for installation of dewatering wells shall constitute full compensation for furnishing all plant, labor, materials, and equipment for performing all operations necessary to install, develop, and test pump each well.
(4) Dewatering turbine pumps, engines, and accessories. /
(a) Dewatering turbine ршпріз, engines, and accessories as specified on the drawings will be measured
for payment on the basis of each pump properly installed and fully operational.
(b) Payment at the contract unit price for installation of dewatering turbine pumps, engines, and accessories shall constitute full compensation for furnishing all plant, labor, materials, and equipment for furnishing and installing the pumps and engines.
(5) Standby turbine pumps,
(a) Standby turbine pumps will be measured for payment on the basis of each complete pump placed on the jobsite.
ф) Payment at the contract unit price for furnishing standby turbine pumps shall constitute full compensation for furnishing the pumps and placing in appropriate storage. Each standby turbine pump shall include all components shown on the drawings including, but not limited to, 130 feet of column pipe and shafting, pump bowls, suction pipe, pump head, gear drive, and flexible coupling.
(6) Standby dieselpower units.
(а) Standby diesel power units will be measured for payment on the basis of each complete power unit placed on the jobsite.
(б) Payment at the contract unit price for furnishing standby diesel power units shall constitute full compensation for furnishing all plant, labor, materials, and equipment for furnishing the diesel engines and placing in appropriate storage. Each standby diesel power unit shall include all components shown on the drawings including the 110-horsepower diesel engine with clutch power takeoff and fuel tank.